ONGOING PROJECT: LDC PODRAVKA
19. 07. 2023.

Progress so far on the construction project of the Logistics and Distribution Center for the investor Podravka d.d., where Gark Konzalting is filling the role of construction supervision, shown here from a bird's eye view:
The video shows 2 of the 3 objects in the total scope of the project - the foundations of the high-rack robotic warehouse and warehouse with a docking terminal. Currently, earthworks and concrete works are being carried out, as well as works on the installation of the prefabricated structure.